Our Projects
References

Swan Technologies has some reference projects:

  • Supplying, Mounting, Erecting and Operating of Cationic Filter in the Demineralization Unit 31 BW (turnkey job) HRC
  • Supplying, Installing and Operating Complete Oxygen Analyzers (turnkey job) in HRC
  • Replacement of old Flame Detectors System with a new one for five units (turnkey job) in General Company for Aleppo Power Station
  • Replacement of O2, CO and CO2 Systems with a new one for five units (turnkey job) in General Company for Aleppo Power Station
  • Maintenance, Spare Parts and Support works of DCS for 3 years at SMAG


Qualifications

Swan Technologies is prequalified for the following projects in HRC:

  • Control System for Air Compressors Unit 28
  • Flowmeters for Delayed Coking and Hydrodesulphurization Sectors (turnkey job)
  • Local Field-Activities for Revamping of CCR Platforming Heaters / KIRCHNER offer
  • Spherical Tank Calibration and Radar Level Measurement System (turnkey job)
  • Online Analyzing & Auto Blending System for Crude Oil Distillation Units (turnkey job)
  • Replacement of the Control & Monitoring System for Turbine Compressors K1 A,B in Plat-forming Unit 500
  • Replacing of Control, Monitoring, Alarm System and all of Instrumentation of CCR Unit 510
  • Replacing of Control System and Instrumentation at Isomerization Unit 210